TBM-Frame and Dummy-TBM for Call for Nomination
Scope of Work
Mock-up Manufacture, Test, Qualification
The IO is responsible for carrying out the Final Design and providing the related 3D models, 2D drawings, and baseline documents. Thereafter the Contractor takes over responsibility for the Manufacturing Design and provides components that fulfils the specified requirements.
Technical_Description_of_TBM-Frame_and_D_CXTN8P_v1_0 (002).pdf
Offsite Inspection services of prefabrications with delegation of IO QCC and PE Group
Scope of Work
The purpose of this framework contract is to provide IO offsite inspection services of prefabrications with delegation of IO QCC and PE group. The details can be found in the Technical Specifications ref.
Attachment
PIN prior information notice resident inspectors.pdf
Technical_Specification_for_Offsite_Insp_8T28P5_v4_0 (3).pdf
Supply of Electricity to the ITER Organization
Contract Description
The ITER Organization is pleased to invite the Domestic Agencies to nominate companies, institutions
or other entities that would be capable to supply the IO:
the provision of electricity; and
the duties and responsibilities foreseen for the Balance Responsibility Entity. (La gestion de l'équilibre) for the ITER’s Site electrical load, in accordance with the rules established by RTE (The French Transmission System Operator (TSO) “Réseau de Transport delectricité”)
The contractor is responsible for the supply of products and their delivery to the IO (ITER Organization) Site, and for ensuring that the product meets the acceptance criteria defined in the Technical Specification.
Attachments
Procurement of: B2M Cryostat Feedthrough Box
Scope of work
The scope of this procurement is the cutting of 7 nozzles already installed on the Cryostat to be replaced by 7 feedthrough boxes to be fabricated and installed
For more details. please refer to Annex II - Technical Summary.
Attachments
A3 In Pit Access Platforms
Contract Description
The scope of work for the Contractor is Design and Manufacturing of the A3 In Pit Access Platforms (IPAP).
For more details, please refer to Annex II.